Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

The Pangasinan 69kV transformer project involves design, supply, testing and trial operation.

 

Client: Philippine Power Transmission Corporation

image5.jpg

【Project Overview 】

 

To meet the rapidly increasing load demand in the Pangasinan region, we provided a complete solution of 69KV level transformers for them. The project began with an in-depth analysis of the power grid. The transformers we designed specifically took into account the local humid and hot climate as well as possible seismic activities, enhancing their moisture-proof and earthquake-resistant capabilities.

 

The equipment underwent on-site witnessing tests by the client's representatives before leaving the factory. After delivery, our technical team provided detailed installation plans and on-site commissioning support, achieving the successful one-time power supply of the transformers. This project not only solved the local power supply bottleneck but also the low-loss characteristics of the transformers brought long-term economic benefits to the operator.

Customer Testimonials

After replacing the energy-saving transformer, the factory's average monthly electricity consumption has dropped by about 15%. The no-load loss and load loss are significantly lower than the national standard. The electricity bill saved by long-term use is close to the equipment purchase cost, and the cost-effectiveness is outstanding.

Jack Richardson

Jack Richardson

Time: 2022.06.24

The quality of the transformers is excellent, and the technical support team is very professional. They helped us customize the solution according to our specific requirements and provided excellent after-sales service.

Sarah Wilson

Sarah Wilson

Time: 2022.07.15

Outstanding product reliability and performance. We have been using their transformers for over 3 years without any issues. The energy efficiency has significantly reduced our operational costs.

Michael Chen

Michael Chen

Time: 2022.08.20